Chapter 2,
Setting up the Galaxy System
Basic Setup
The following basic steps are necessary to start testing with the Galaxy
System.
Stand Alone Test System Unit
Figure 2-1. Stand Alone Unit
Bench-top Unit
1. Place Test Stand on a flat, stable surface.
2. Make calibration gas connections as shown in FIGURE 2-1.
3. Plug the power supply into the the Test Stand power jack, which is
located on the bottom of the rear housing panel, toward the left-
hand side (when facing the Test Stand).
2-1