Receiving The Machine; Machine Equipment - Blakeslee RC-62-3 DR24 Notice D'installation, D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.2.3 Receiving the machine

Pay special attention in choosing the lifting points and the machine barycentre during the loading and unloading operations
(see paragraph
1.2
Handling).
Before accepting the machine, verify that all the data on the data-plate corresponds to the required ones (as shown on par.
1.1) and to the ones of the available electrical supply.
After unpacking, make sure the machine has not been damaged during transportation. If so, do notify the seller immediately
about the problem. If the damage might question the machine safety, do not install it.
The installation and the starting of the machine must be carried out by trained operators only, even if the machine is coming
from another site and it has been used, already.
Adaptation of the electrical and water system for dishwasher installation must be carried out by only qualifi ed operators.
See par.
10.2
for disposing the packing material.
This machine has to be used in a place with room temperature between 41°F (5°C) and 95°F (35°C) max. The room has to
be dry and ventilated.

1.2.4 Machine equipment

Use and maintenance manual
Wiring diagrams
Connection diagram (lay-out)
Plastic coated maintenance diagram
A copy of the wiring diagrams must be kept inside the electrical board.
pict. 3
Connection diagram
example
USA
page 37

Publicité

Table des Matières
loading

Produits Connexes pour Blakeslee RC-62-3 DR24

Table des Matières