SMA SUNNY BOY 3.0-US Instructions D'installation page 43

Masquer les pouces Voir aussi pour SUNNY BOY 3.0-US:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SMA Solar Technology America LLC
• Insert the screw through the spring washer,
the clamping bracket and the washer.
• Guide the equipment grounding conductor between the washer and clamping bracket
and tighten the screw with a Torx screwdriver (TX 25) (torque: 6 Nm ± 0.3 Nm
(53.10 in-lb ± 2.65 in-lb)).
7. Plug the connecting terminal plate for connecting
the outlet for secure power supply operation into
the SPS slot in the inverter and tighten it with a
flat-blade screwdriver (blade width: 3.5 mm
(0.14 in)).
8. Ensure that the connecting terminal plate is securely in place.
9. Strip off the conductor insulation by max. 15 mm (0.59 in).
10. In the case of finely stranded wire, provide the conductors L and N with a bootlace ferrule.
11.
Connection of conductors of finely stranded wire
To connect conductors made of finely stranded wire, each terminal must be opened.
• First insert the connector into the round terminal all the way to the lock. Then insert
a flat-blade screwdriver (blade: 3.5 mm (0.14 in)) as far as it can go into the
square clamping contact above the round terminal. This opens the lock and the
connection to the connecting terminal plate can occur. After the connection has
been made, the flat-blade screwdriver must be pulled out of the square clamping
contact.
12. Connect the conductors L and N to the
connecting terminal plate in accordance with the
labeling. Insert each conductor into the
corresponding round terminal up to the stop.
Installation Manual
6 Electrical Connection
SB30-77-1SP-US-40-IA-xx-13
43

Publicité

Table des Matières
loading

Table des Matières