Switching The Pump On - Speck pumpen BADU SD Eco VS Fiche Technique

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 116
Start-up
Pos : 90 /T echnisc he Dokumentation/Betriebsanl eitung/Inbetri ebnahme/Pumpe ei nsc halten @ 0\mod_1427962694084_370.doc x @ 27343 @ 2 @ 1
6.3

Switching the pump on

Pre-requisites:
Strainer basket is installed, where applicable.
Lid is fitted securely.
1.
Open the valve on the intake side completely.
2.
Only open the valve on the delivery side halfway.
N O T IC E
The pump can be damaged if it runs dry!
Purge air from the pump and suction line.
3.
Switch the pump/unit on.
N O T IC E
If the pump has a three-phase motor and it turns in the wrong
direction, the pump/unit is louder and has a lower capacity.
4.
For three-phase motors: Ensure that the motor turns in the
direction of the arrow labeled on the fan hood. If the motor
rotates in the wrong direction, notify an electrician.
5.
As soon as full speed is reached, open the valve on the
delivery side completely.
6.
Check the mechanical seal for leaking.
Pos : 91 /T echnisc he Dokumentation/Allgemei ne Module/#### Sei tenumbruch #### @ 0\mod_1426069111812_0.doc x @ 891 @ @ 1
22 EN
10|2015

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Badu bi-onze eco vs

Table des Matières