COMMISSIONING
The authorized person installing this equipment must commission the
equipment in accordance with local gas safety regulations - gas leakage,
operational checking, adjustments and instructing the owner on use of the
equipment are prescribed requirements.
INSTALLATION
THIS EQUIPMENT MUST BE INSTALLED BY AN AUTHORIZED
PERSON IN ACCORDANCE WITH LOCAL AUTHORITY, GAS,
ELECTRICITY, ANY APPLICABLE STATUTORY
REGULATIONS AND MANUFACTURER REQUIREMENTS.
NOTE: INSTALLATION IS THE RESPONSIBILITY OF THE OWNER
Gas Inlet Connection:
Gas Connection Point:
Gas Connection:
All units are tested and adjusted at the factory; however, all burners and pilots
must be checked at the installed location and adjusted as necessary.
Gas fryer Manual
WWW.HOREPA.NL
SPECIFICATIONS
1/2" BSP Female.
The gas connection point is located at the rear of
the unit
Details are shown in the drawings at the rear of
this manual.
The appliance
must be connected
authorized person to the gas type specified on the
unit. The gas type is shown adjacent to the gas
connection point on the rear panel and on the data
plate. Connect to and use only the correct type
of gas.
The authorized person installing this equipment
must comply with local gas safety standard.
Prescribed requirements include, commission the
equipment, gas leakage testing, operational
checking and adjustments.
Tel: +31 (0)653140903
Page 6
by an