5.5
Electrical connections:
The electrical connection must be made in accordance with the local safety regulations in
force, and exclusively by qualified personnel.
Make the electrical connections, following the indications given in this booklet and in the booklet
supplied with the pump and the control panel.
For connecting the system it is recommended to use exclusively the panels indicated by the manufacturer,
supplied complete with detailed instructions for electrical connection and use.
FEKAFOS 200 l:
PUMP MODEL
FEKA 600
FEKA VS-VX 550
FEKA VS-VX 750
FEKA VS-VX 1000
FEKA VS-VX 1200
FEKAFOS 280 l:
PUMP MODEL
FEKA VS-VX 550
FEKA VS-VX 750
FEKA VS-VX 1000
FEKA VS-VX 1200
FEKA 1400
FEKA 1800
GRINDER 1400
GRINDER 1800
FEKA 2500
FEKAFOS 280 l DOUBLE:
PUMP MODEL
FEKA 600
FEKA VS-VX 550
FEKA VS-VX 750
FEKA VS-VX 1000
FEKA VS-VX 1200
FEKA 2500
FEKAFOS 550 l:
PUMP MODEL
FEKA 600
FEKA VS-VX 550
FEKA VS-VX 750
FEKA VS-VX 1000
FEKA VS-VX 1200
FEKA 1400
FEKA 1800
GRINDER 1800
The pumps are provided with an earthed cable; ensure that the earth system is efficient. Before connecting the system
to the mains, ensure that the mains voltage is the same as the value indicated on the pump data plate and that the earth
connection can be made efficiently.
It is recommended to apply the pump data plate (supplied in the package in addition to the one already applied on the
pump by the manufacturer) on the tank, in a clearly visible position, or on the control box.
The connection must be made as follows:
Pump:
Pass the pump cable through the fairlead preassembled on the tank (149), tighten the ring nut and connect the cable to
the control panel as indicated in the respective manual.
Floats:
The floats (two for FEKAFOS 200 l and FEKAFOS 280 l, three for FEKAFOS 550 l – FEKAFOS 280 l DOUBLE) are
already installed and set at the right height inside the tank.
Pass the float connecting cables through the fairleads preassembled on the tank (149), tighten the ring nut and connect
the cable to the control panel as indicated in the respective manual, taking care that the terminals on the panel
correspond to the respective float cables.
ENGLISH
SINGLE PHASE
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
SINGLE PHASE
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 1,3 M / E-BOX 2D M/T
ED 3 M / E-BOX 2D M/T
- -
ED 3 M Hs / E-BOX 2D M/T
- -
- -
SINGLE PHASE
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
- -
SINGLE PHASE
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
- -
- -
THREE PHASE
ED 1 T / E-BOX 2D M/T
ED 1 T / E-BOX 2D M/T
ED 1 T / E-BOX 2D M/T
ED 1,5 T / E-BOX 2D M/T
ED 1,5 T / E-BOX 2D M/T
THREE PHASE
ED 1 T / E-BOX 2D M/T
ED 1 T / E-BOX 2D M/T
ED 1,5 T / E-BOX 2D M/T
ED 1,5 T / E-BOX 2D M/T
- -
ED 2,5 T / E-BOX 2D M/T
- -
ED 2,5 T / E-BOX 2D M/T
ED 2,5 T / E-BOX 2D M/T
THREE PHASE
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/ T
E-BOX 2D M/T
THREE PHASE
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
E-BOX 2D M/T
- -
E-BOX 2D M/T
E-BOX 2D M/T
30

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Fekafos 200 feka vs-vx 550Fekafos 200 feka vs-vx 750Fekafos 200 feka vs-vx 1000Fekafos 200feka vs-vx 1200Fekafos 280 feka vs-vx 550Fekafos 280 feka vs-vx 750 ... Afficher tout

Table des Matières