5. Installation of the setting-up kit
5.2
Assembling the holding plates for four-tank systems
In the first SBR basin, only the sludge return and the disc diffusers are attached to the holding plate. The
clamps are assembled according to section 5.1.
F (DN 50)
F (DN 50)
F (DN 70)
G (DN 32)
G (DN 32)
Figure 5: Holding plate 1st SBR basin
Figure 6: Holding plate 2nd SBR basin
In the second SBR basin, assembly of the holding plate is carried out as described in section 5.1.
33 / 92