The following items are not included in the shipment:
KG pipes for tank connections
Hoses to supply air from the switch cabinet to the septic tanks. The following air hoses are
required:
Two-tank systems
Four-tank systems (32 and 44 PE)
Four-tank systems (50 PE)
The following parts can be ordered using article numbers:
5-metre hose assembly
10-metre hose assembly
15-metre hose assembly
20-metre hose assembly
The hose assemblies each contain 3 x 13 mm and 1 x 19 mm. Alternatively, PVC hoses can be
ordered by the reel:
20-metre PVC hose, transparent, 13 x 3 mm*
20-metre PVC hose, red, 13 x 3 mm*
20-metre PVC hose, black, 13 x 3 mm*
20-metre PVC hose, blue, 19 x 3 mm*
Lubricant, sealant, Teflon tape etc.
Core drill Ø 124 mm. This can be purchased from Otto Graf GmbH using article number 202003.
Carat S septic tank and covers must be ordered separately.
*In order to avoid confusion, the lifters, the ventilation downpipe and the four connectors on the switch
cabinet are all colour coded, this assist assembly & installation.
1. Shipment
3 x 13 mm
1 x 19 mm
4 x 13 mm
2 x 19 mm
6 x 19 mm
107189
107190
107191
107192
934011
934014
934017
934020
26 / 92

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Klaro e

Table des Matières