12. Emergency start
Art. No. 3010 218
Disconnect the 12V cable and the cable to the panel on the boiler.
Connect a cable between 2 and 9 in the connector on the boiler.
Reconnect 12V to the boiler
Now the boiler starts with gas and 1kW. Adjustment of the room temperature
is not working. Constant pump operation is set.
2
9
Control
230 V
Fuse 3,15 A (+)
12 V
Fuse 3,15 A (-)
panel
pump
pump
12 V DC
17