Declaration Of Compliance; Technical Data Table; Installing The Appliance; Electrical Connection - Lotus F45-78G Instructions Pour L'installation Et L'emploi

Friteuses a gaz usage professioneel
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The manufacturer declares that the appliances are compliant with the prescriptions of the EEC norm 90/396 for the gas
part and with norm 73/23 for the electric part. The installation must be done observing the norms in force particularly
concerning room ventilation and discharging gas emissions.
N.B.: The manufacturer declines any responsibility for direct or indirect damage caused by improper or incorrect
installation, alterations, maintenance or use of the appliance, as in all the other cases considered in the items of our sales
conditions.
MODEL
F45-78G
The operations for installing, conversions for use with other types of gas and starting up must be done only by
qualified personnel whose qualifications comply with the norms in force.
The gas installation, the electrical connections and the rooms in which the appliances are installed must comply
with the norms in force in the Country in which the installation is effect; above all, the appliance must be installed
in a well ventilated room, preferably under an extractor hood, so as to ensure the complete extraction of gas
emissions which are formed during combustion. The air necessary for combustion is 2
installed.
The power lead is supplied with the appliance.
The connecting terminal block is behind the front protection panel.
To replace the power lead proceed in the following way:
- Disconnect power.
- Remove the front protection panel.
- Disconnect the cable from the leading in terminal block.
- Loosen the clamp and pull the cable out.
- Put the new power lead through the clamp, connect the wires to their relative terminals on the terminal block and fix
them.
- Lock the lead with the clamp and put the front protection panel back in place. The earth wire must be longer than the
others so that if the clamp breaks, it comes away after the electricity cables.
The appliance must be connected to an equipotential system.
The connection screw is positioned at the back of the appliance and is identified by the
Attention! The manufacturer will neither be held responsible for, nor will give any compensation during the guarantee
period for any damage caused, and which is due to inadequate installations not compliant with the instructions.
Make sure that the air intake into the room where the appliance is installed is sufficient for an adequate change of air, as
specified by regulations in effect.
The appliances installed in buildings open to the public must satisfy the following requirements.

Installation rules

The installation and maintenance of the appliance must be done according to the correct procedures and regulation
texts in use, particularly:
• safety standards for the prevention of fire and panic.
Connection and installation of appliance, ventilation and exhaust removal systems, shall be done according to the
Manufacturer's instructions and by qualified technicians and according to the regulations in effect. The electric wiring
shall conform to the regulations in effect. All fire prevention codes shall be observed.
a) General indications (Rules valid for GB only)
GB

DECLARATION OF COMPLIANCE

TECHNICAL DATA TABLE

NOMINAL HEAT OUTPUT
DIMENSIONS
cm
Electric
(230 Vac-1)
80x70x90h
0,005

INSTALLING THE APPLIANCE

ELECTRICAL CONNECTION

EQUIPOTENTIAL

CHECKING FOR ADEQUATE VENTILATION

IE
TOTAL KW
Gas
44
31
GAS CONNECTION
ISO 7-1
R 3/4 GM
3
/h per kW of power
m
symbol.

Publicité

Table des Matières
loading

Table des Matières