Commissioning Of The Boiler - Baxi 45 HTE Notice D'emploi Destinée À L'usager Et À L'installateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. commissioning of the boiler

To correctly light the burner proceed as follows:
1) provide power supply to the boiler;
2) open the gas cock;
3) follow the directions given below regarding the adjustments to be made at the boiler control panel.
Figure 1
IMPORTANT: Domestic Hot Water (D.H.W.) instructions here discribed, are to take in account only if the
boiler is connected to a D.H.W. production system.
KEYS
Domestic hot water on/off key
Central heating water temperature setting key
Domestic hot water temperature setting key
Reset key
Program access and scroll keys
Program access and scroll key
Parameter setting key (decrease value)
Parameter setting key (increase value)
Data display reset key
Central heating mode setting key
IstructIons pErtaInIng to thE usEr
DISPLAY SYMBOLS
Operation in domestic hot water mode
Operation in central heating mode
Operation in automatic mode
Operation in manual mode at the max­imum
temperature set
Operation in manual mode at minimum tem-
perature
Standby (off)
Outdoor temperature
Flame present (on)
Resettable alarm warning
MAIN display
SECONDARY display
44
912.359.1 - IE

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

65 hte85 hte100 hte120 hte150 hte

Table des Matières