Capital Safety DBI SALA 8561233 Manuel page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
F.
AFTER A FALL: Any equipment which has been subjected to the forces of arresting a fall or exhibits
damage consistent with the effect of fall arrest forces as described in section 5, must be removed from
service immediately and destroyed by the user, the rescuer, or an authorized person.
3.3
ASSEMBLY
A.
The Side Entry System Arm Assembly is comprised of two separate assemblies which are joined during
set up. No tools are required for this assembly procedure.
B.
The Primary Boom, Figure 3 (1), connects to the articulating, expandable Secondary Boom Assembly
(3) with the use of the Elbow Pin (2). The Secondary Boom expansion distance is set by use of the two
Secondary Boom Positioning Pins (4).
The Primary Boom is connected to a support post, Figure 3 (5, typical support post shown) or tank
collar. The Secondary Boom has a receiver on both sides to allow for locating a support post or
tank collar on the left or right side of the manway. This accommodates obstacles, entry geometry
and supervisory preferences. Refer to the appropriate section of this and other related manuals for
information on accessory installation, operation, maintenance, inspection and repair.
3.4
SET UP:
The DBI-SALA Side Entry System is designed for use with a variety of support posts and also
external tank collars. Consult the appropriate section of this manual or separate manuals when
setting up or installing any DBI-SALA post or collars.
Step 1: Before setting up for any work at heights, fall arrest, or confi ned space entry be sure that you
have all equipment required to safely carry out the work to be performed, and to meet all
applicable standards and regulations for your area.
Step 2: Set-up or locate the Side Entry System intended for use in the application according to the
instructions in the applicable section of this manual. Ensure that the post and post base, or tank
collar, is structurally sound and free of any corrosion or contamination which may affect the
insertion of connecting pins or the structural integrity of the post, base or collar. Regulations
governing Fall Protection, Confi ned-Space Entry/ Retrieval and Rescue Procedures vary with
jurisdiction. It is the responsibility of the owner and/or user of this equipment to be aware of
applicable regulations and ensure that equipment selected for each job complies with these
requirements. Refer to the appropriate section of this or any other applicable manuals for specifi c
information on the installation and use of the type of base you are using prior to using the system.
3.4.1 SET UP USING A SUPPORT POST
Step 1: As shown in Figure 4, insert the Support Post (6, sold separately) into the Permanent Post Base
(8, sold separately).
Step 2: Adjust the Support Post to the required working height (approximately) by installing the Support
Post Positioning Pin (9) through the appropriate set of holes. The overall height of the support post
should be approximately 200 mm above the top of the manway opening. If additional height is
needed, a Mast Extension (7, sold separately) may be used.
Step 3: Place the Primary Boom assembly (1) over the top of the Support Post (6).
Step 4: Remove the Elbow Pin (2) from the Secondary Boom assembly (3). Position the boom as shown in
Figure 4 and replace the Elbow Pin (2). For winch installation (10, sold separately), see the winch
installation section of this manual.
Step 5: Set the extension length of the Secondary Boom (3) to the position required for the work
situation. Use the Secondary Boom Positioning Pins (4) to secure the boom extension position.
WARNING: All mounting/set-up locations for permanent or portable systems must be approved to
local standards by a qualifi ed engineer and must comply with all mounting requirements and application
restrictions as outlined on the applicable DBI-SALA Product Specifi cation Sheet. Failure to follow this
restriction may result in serious injury or death.
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dbi sala 8541683

Table des Matières