Mounting Bracket - Rotary SPOA10NB Instructions D'installation

Élévateurs
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

14. 3ø Control Box Installation:
A) Attach Mounting Bracket on column, as shown in Fig.
22a, using (1) 5/16"-18NC x 1/2" Socket Head Counter
Sunk Machine Screw, (2) 5/16"-18NC x 1/2" HHCS, and
(2) 5/16" Flat Washers.
B) Attach Control Box to Bracket using (4) 1/4"-20NC
x 1/2" HHCS, (4) 1/4" Flat Washers, and (4) 1/4" Star
Washers.
C) Route cord through strain relief on motor and connect
per table on the bottom of page 13.
Note:
The contactor in the control box has a 480V coil.
For installations where the electric supply is 230V,
the coil must be replaced with the extra 230V coil
shipped with the control box. For 575V electric
supply, the coil must be replaced with the extra
575V coil shipped with the lift.
208-240V, 480V, OR 575V
1 & A1 FOR
OVERHEAD SWITCH
CONNECTION
JUMP 1 & A1 IF
LIFT DOES NOT
HAVE OVERHEAD
SWITCH
Fig. 22b
1/4" Flat Washer
1/4" Star Washer
1/4"-20NC x 1/2" HHCS
AC INPUT

Mounting Bracket

5/16"-18NC x 1/2" HHCS
14
5/16" Flat Washer
Fig. 22a

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Spoa10Spo10Spoa7500 serie700 serie800 serie

Table des Matières