6.1 – SELECTION OF THE GEARMOTOR POSITION WITH
RESPECT TO THE GATE, ON THE CONTROL UNIT
The gearmotor is factory set to be installed on the right-hand side of the
gate: this setting is made by the position of the electric jumper "Sel" on
the control unit as shown in fig. A.
Otherwise, if installing the gearmotor on the left-hand leaf, move the elec-
tric jumper "Sel" to the position shown in fig. B.
fig. A
fig. B
12 – English
6.2 – INSTALLING AND CONNECTING
FLASHING LIGHT mod. MF
This flashing device indicates execution of each manoeuvre. It is also con-
nected to the diagnostics system of the control unit and in the event of
malfunctions signals the type of problem by means of a pre-set sequence
of flashes (see paragraph "What to do if...").
To install and connect the flashing light proceed as follows:
01. Fig. 17:
Extract one of the two transparent covers, turning it anti-clockwise
and set aside.
17
02. Fig. 18:
Use two fingers and at the same time press the two tabs at the bot-
tom and use the other hand to remove the external cap of the flash-
ing light.
18
03. Fig. 19:
Drill the marked sections on the base of the flashing light for fixture of
the screws and routing of the cables.
19