Commissioning; Network Connection - Conel FLOWSAN Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
32
9.

Commissioning

Network connection

The mains connection is made via the mains connection cable with Schuko plug connected to the
control panel into a Schuko socket provided by the customer.
ATTENTION!
The control panel must not be connected directly to the power supply system without a Schuko plug.
Pump connections
1.
Schuko socket for Pump 1
2.
Schuko socket for Pump 2
NOTE!
After installation work in the pump sump has
been completed, the Schuko plugs from the pumps
must be plugged into the Schuko sockets located
on the left side of the control panel.
Pump preselection via rocker switch
FLOW TP12-N, TP12-A
(230V~ / 1.6 A / 0.36 kW)
ATTENTION!
Set level control of TP12-N and TP12-A
to the "Hand" position.
Level switch connections
"A": ALARM
"B": START
"C": STOP
FLOW TP30 OS
(230V~ / 3.6 A / 0.8 kW)
ATTENTION!
Use FLOW TP30 OS pumps
without float switches.

Publicité

Table des Matières
loading

Table des Matières