Scope Of Delivery; Commissioning And Operation; Maintenance And Care - Mato SB 23 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Repair / maintenance
Disconnect the power supply (pull the mains plug) and relieve the pressure on the system by
opening the nozzle before carrying out any repair or maintenance work.
Regularly check the pressure-carrying parts (delivery hose) and the live parts for possible
damage. Replace defective parts immediately with original parts.
The use of non-original accessories, e.g. hose lines, connections, may entail the risk of accidents
in individual cases. No liability can be accepted for accidents and damage caused by third-party
parts.
Conversion or modification of the system is only permitted after consultation with the
manufacturer.
The operational safety of the unit is only guaranteed if it is used as intended.
Maintenance, inspection and repair work may only be carried out by qualified personnel.
Caution: hot components only cool down gradually after switching off.
2
Intended use / warranty:
The electric diaphragm pump is suitable for transferring and filling AdBlue urea solutions, water
and antifreeze.
Flammable liquids (petrol, diesel), solvents and liquids with a viscosity > 20 cSt must not be
conveyed with the pumps.
Any other use, as well as conversion or modification of the system is only permitted after
consultation with the manufacturer.
We are subject to the scope of the statutory warranty obligation (see our terms of delivery) if the
operating instructions are observed and the system is used as intended.
In case of warranty claims, please include your invoice together with the date of purchase
3

Scope of delivery:

The individual components are shown on page 8.
4

Commissioning and operation:

- Observe the suction side and discharge side of the pump. The flow direction is marked with an
arrow on the front of the pump.
- Mount the suction and delivery hose to the pump using the appropriate accessories such as a
nozzle or meter.
Before putting the system into operation, check all connection points for firm seating and
tightness.
- Plug the 220V power plug into a power outlet or connect the battery terminals.
- In regards to the 12V - 24V version, first connect the + pole and then the - pole to the battery.
- Ensure that the pump is switched off.
- The pump is now ready for use.
5

Maintenance and care:

The electric diaphragm pump is maintenance free.
Regularly check the pressure-carrying parts (pressure hose and nozzle) and the live parts of the
pump for possible damage or wear.. Replace defective parts immediately with original parts.
If the system is not used for 2 weeks or longer, empty it completely and rinse it with a neutral
liquid (water).
Ordering spare parts:
The following information is required when ordering spare parts:
Type specification, designation of the ET, order number
10
MATO
GmbH & Co. KG
/ Benzstr. 16-24 / 63165 Mühlheim a. Main / Tel:00 49(0)6108-906-0 / Fax: 00 49(0)6108-906-120
Operating instructions
SB 23 - SB 30 - SB32

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sb 30Sb 32Adblue sb 23Adblue sb 30Adblue sb 32

Table des Matières