Scope Of Delivery; Commissioning And Operation - Mato SB 19 Mode D'emploi

12v / 230v
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Repair / maintenance
Disconnect the power supply (pull the mains plug) and relieve the pressure on the system by
opening the nozzle before carrying out any repair or maintenance work.
Regularly check the pressure-carrying parts (delivery hose) and the live parts for possible
damage. Replace defective parts immediately with original parts.
The use of non-original accessories, e.g. hose lines, connections, may entail the risk of accidents
in individual cases. No liability can be accepted for accidents and damage caused by third-party
parts.
Conversion or modification of the system is only permitted after consultation with the
manufacturer.
The operational safety of the unit is only guaranteed if it is used as intended.
Maintenance, inspection and repair work may only be carried out by qualified personnel.
Caution: hot components only cool down gradually after switching off.
2
Intended use / warranty:
The electric centrifugal pump is suitable for transferring and filling AdBlue urea solutions, water
and antifreeze.
Flammable liquids (petrol, diesel), solvents and liquids with a viscosity > 20 cSt must not be
conveyed with the pumps.
Any other use, as well as conversion or modification of the system is only permitted after
consultation with the manufacturer.
We are subject to the scope of the statutory warranty obligation (see our terms of delivery) If the
operating instructions are observed and the system is used as intended.
In case of warranty claims, please include your invoice together with the date of purchase
3

Scope of delivery:

The individual components are shown on page 8.
4

Commissioning and operation:

- Mount the delivery hose and nozzle to the pump.
Before putting the system into operation, check all connection points for firm seating and
tightness
.
Connect the telescopic
suction pipe to the
height of the container.
Insert the outlet of the
nozzle into the tank nozzle.
10
MATO
GmbH & Co. KG
Insert the telescopic suction
pipe into the container.
Toggle switch up
 ON
/ Benzstr. 16-24 / 63165 Mühlheim a. Main / Tel:00 49(0)6108-906-0 / Fax: 00 49(0)6108-906-120
Tighten drum adapter.
Operate the nozzle to start
the fluid delivery.
Operating instructions
SB 19 – 12/230V
Remove the nozzle from the
holder.
Release the hand lever of
the nozzle to stop
dispensing.

Publicité

Table des Matières
loading

Table des Matières