Packaging; Starting, Operation - SICK PBT Mode D'emploi

Masquer les pouces Voir aussi pour PBT:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating Instructions

6. Packaging

Has everything been supplied?
Check the scope of supply:
Completely assembled pressure transmitters
Ordered accessories
Inspect the pressure transmitter for possible damage during transportation. Should there
be any obvious damage, inform the transport company and SICK without delay.
Keep the packaging, as it offers optimal protection during transportation (e.g. changing
installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
damaged.

7. Starting, operation

Required tools: wrench (flats 27), screw driver
Diaphragm test for your safety
It is necessary that before starting the pressure transmitter you test the instrument visually, as the
diaphragm is a safety-relevant component.
Pay attention to any liquid leaking out, for this points to a diaphragm damage.
Use the pressure transmitter only if the diaphragm is undamaged.
Use the pressure transmitter only if it is in a faultless condition as far as the
Warning
safety-relevant features are concerned.
20
6. Packaging / 7. Starting, operation
© SICK AG • Germany • All rights reserved
PBT
GB
8013153/1B2T/2021-03-17

Publicité

Table des Matières
loading

Table des Matières