Removing The Supply Unit From The - Amann Girrbach ceramill motion 3 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 65
H A N D L I N G T H E C O O L A N T / L U B R I C A N T ( C / L )
7.2

Removing the supply unit from the

set-up cart
NOTE:
Possible damage of the electric lines and the C/L
supply line:
▷ When moving the set-up cart, pay attention
that no lines are driven over.
▷ Move the set-up cart out from below the table.
▷ Remove the left-hand side wall of the set-up
cart.
▷ Pull the C/L drain pipe [1] and the C/L supply line
[3] at the top from the supply unit.
▷ Pull off control cable [2].
1
3
Fig. 16 Releasing the interfaces at the supply
unit
1 C/L drain pipe
2 Control cable
3 C/L supply line
NOTE:
Possible damage to the drain cock!
▷ Move/carry the supply unit only by the han-
dles!
▷ Carefully lift the supply unit [2] out of the set-up
cart.
Fig. 17
1 Set-up cart
2 Supply unit
2
E N
1
2
55

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ceramill coolstream

Table des Matières