Cf.: Check sheet available on:
Regulatory checks (provided for in the French decree of 21st December 2004) are outlined as follows:
A check prior to use at each installation site:
- when the mobile tower is used for the first time,
- when the mobile access and working tower is dismantled and then re-assembled.
- following changes in usage conditions, or atmospheric or environmental conditions which may affect the
safe use of the mobile access and working tower,
- when the tower has not been used for at least a month.
This check should include a suitability assessment, an assembly and installation assessment, as well as an
assessment of its condition. This check will be recorded in the establishment's safety records for
traceability.
A Daily check
- This is a condition assessment.
A quarterly check
For the mobile access and working tower, the scope of this check is comparable to the daily check. It will
be carried out at least once every 3 months, and will be recorded in the establishment's safety records for
traceability.
Nota bene: These checks can only be carried out by personnel holding a certificate of competence entitled
"Checker
MAINTENANCE:
Keep parts clean, and safety devices in good working order.
Replace or clean all the panels or stickers with operating and safety instructions.
To find out more about the after-sales service for the various parts, visit our website:
http://tubesca-comabi.com/documentation-technique/
Chapter 10:
• Before dismantling:
- Ensure that the mobile access and working tower is stable:
- the brake wheels are locked,
- the stabilisers are correctly positioned etc.
- Have ropes available to handle items if required,
- PPE must be worn.
• Before handling:
Put the split pins back on to the components.
-
- Put damaged parts to one side to be replaced.
• During dismantling:
106-A000035745 - ind.0 – 11/2021
https://www.tubesca-comabi.com/fr/centre-de-documentation
Dismantling
99