7. Repeat steps 1 to 6 to build the second guard rail.
8. Remove the temporary platform from rung no. 2.
3-1-8 – Cross brace assembly
• Install the two cross braces facing each other on the spring fingers.
• Position the cross braces so that the curve faces outwards to facilitate installation of the
platform.
• When installing the cross braces, make sure that the spring slats are functioning properly.
106-A000035745 - ind.0 – 11/2021
71