Night program
● Performance level 2 while room is being used,
performance level 1 during overrun time.
● J4 open, J5 open
100
90
80
70
60
50
40
30
20
10
0
Adjustable
Switch-controlled
start delay
operating time
Economy program
● Performance level 1 during operation and
overrun.
● J4 open, J5 bridged
100
90
80
70
60
50
40
30
20
10
0
Adjustable
Switch-controlled
start delay
operating time
Power program
● Performance level 2 during operation and
overrun.
● J4 bridged, J5 open
100
90
80
70
60
50
40
30
20
10
0
Adjustable
Switch-controlled
start delay
operating time
92 m³/h
78 m³/h
Adjustable
overrun time
92 m³/h
78 m³/h
Adjustable
overrun time
92 m³/h
78 m³/h
Adjustable
overrun time
Fit electronics cover.
NOTICE
t
Insert electronics cover into housing
recesses A, B and C with the 3 latches until
they snap into place. Press the electronics
cover firmly on to the housing at the points
indicated by the arrows.
t
For unit versions F, KF, H, KH, B and KB,
insert the sensor supplied [9] in the correct
position (arrow X) in the connector base.
Fit cover [6].
Set start delay and overrun time in
accordance with Chapter 8.5.
Fit designer cover [7] (see Fig. B).
t
Danger of short circuits and
damage to unit! Humidity will
penetrate if electronics cover
is not used correctly.
Press electronics cover firmly
onto housing such that it is
sealed and flush all the way
around.
Do not press setting buttons
[11] and [12].
GB
17