Installing Fast--Pak Agent - Nobles Speed Scrub 2701 Opérateur Manuel Et Liste Des Piéces

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Unfasten black latch at front of machine and hinge
open skirt housing to access motor hub (Figure 8).
4. Select recommended pad or brush that best
meets your cleaning needs.
NOTE: Consult your authorized distributor for pad and
brush recommendations.
5. (For Pad Installation) Attach pads to pad drivers
before connecting drivers to motor hub. To attach
pad to driver, remove plastic centerlock ring from
pad driver. Position pad on pad driver and replace
centerlock ring (Figure 9).
6. Attach brush/pad drivers to motor hubs. Align (3)
mounting studs with slots in motor hub. Give driver
a quick turn toward spring clip located on motor
hub. Be certain pad driver is securely fastened
and spring clip locks into one of the studs before
operating machine (Figure 10).
Speed Scrub 2701/3301 (07- -04)
FIG. 8
FIG. 9
Home Find... Go To..
FIG. 10
NOTE: Always make sure pad driver and motor hub
surfaces are clean before installing drivers. Keeping
surfaces clean will make it easier when removing pad
drivers.
7. Close skirt housing and refasten latch.
INSTALLING FaST- -PAK AGENT (FaST MODEL)
1. Remove the perforated knock-out from the
FaST--PAK carton. Do not remove the bag from
the carton. Pull the hose connector through the
knock--out and remove the orange cap (Figure 11).
ATTENTION: The FaST- -PAK Concentrate Formula
is specifically designed for the FaST system.
NEVER use a substitute, machine damage will
result.
FOR SAFETY: When using machine, always follow
the handling instructions on chemical container.
2. Place the FaST--PAK carton in the carton holder at
the rear of the machine and connect the supply
hose to the FaST--PAK bag (Figure 12).
NOTE: If any dried concentrate is visible on the supply
hose connector or on the FaST- -PAK connector, soak
and clean with warm water.
OPERATION
FIG. 11
9

Publicité

Table des Matières
loading

Table des Matières