Télécharger Imprimer la page

Dalla Corte mina Notice Pour L'utilisateur page 49

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Starting and using
• Rotate the M dial knob to select the desired pouring mode - position
for the single shot,
yoke manual pouring. For FLASH pouring, just lower the lever yoke
and lift it immediately afterwards.
• Push the M dial knob to start pouring if
selected. Conversely, if you confirm the
the 2-secs flash mode. Immediately afterwards, move the lever
yoke gradually: the L13 to L17 lights will come on, depending on
the position of the yoke itself.
Hot milk preparation
NOTE
To obtain good quality milk foam, it is necessary to perform a
specific procedure during milk heating. Due to safety reasons, the
procedure is not described in this manual, but it can be taught in
training courses or specific videos. Grab and handle the steam
wand by its insulating hook. Avoid turning on the steam knob before
placing the steam wand into the pitcher to avoid getting burned.
for the double shot or L5 for the lever
or
position, you will obtain
positions are
| 49

Publicité

loading

Ce manuel est également adapté pour:

A12001120