US English
User Manual RAIS X-Basic, RAIS X-Front & RAIS X-Board
Installation of the stove - X-Basic
2 persons ca 2 – 2½ hour
Necessary tools:
Leveler
Enclosed:
2 pair gloves
2 combination wrenches No 8
Allen wrench nr 3 for opening the stove door
Smoke connector
Fixing sets for the steel panels
Users manual
Installation manual
Important installation advice:
Use the gloves delivered with the stove.
Stove may not be lifted by the panel holders placed on the sides.
Take care that small items as springs, washers, bolts and nuts are
not misplaces while doing the installation.
INFO: Counter nuts are only necessary for transport. May be omit-
ted when making the final installation of the panels.
11