Receptacle Wiring Diagram; Battery Back-Up Installation - Napoleon BHD4N Instructions D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2

RECEPTACLE WIRING DIAGRAM

NOTE: Ensure that the transformer is plugged into the receptacle.
7.3

BATTERY BACK-UP INSTALLATION

In case of a power outage locate your battery housing (located in the control compartment).
A.
Install the 4 "AA" batteries, if not already installed.
B.
Connect the battery housing to the battery connector located in the control compartment of the
C.
appliance (refer to the illustration below).
NOTE: It is recommended that you change the battery at the start of the heating season.
BATTERY
CONNECTOR
ELECTRICAL
BOX
3 PRONG
RECEPTACLE
BATTERY
HOUSING
CABLE
L1
CONNECTOR
(BLACK)
GROUND
L2
(GREEN)
(WHITE)
WIRE
NUTS
43
EN
W415-1285 / 04.14.14

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Bhd4p

Table des Matières