At a glance.
1 Grinding belt tensioning device (GX75)
2 Cover/stop (GX75)
3 Spark guard (GX75)
4 Star-knob bolt, chip/grinding-dust box (GX75)
5 Grinding rest (GX75)
6 Dust collector (GX75)
7 Lever for tilting device (GX75)
8 Side cover (GX75)
9 Wing bolt
10 Star-knob bolt for adjustment of GXC
11 Brake-wheel drive motor
12 Star-knob bolts for brake-wheel parallelism
13 Handle
14 Basin
15 Casters
16 Lever for applying brake wheel against
the workpiece
17 Brake wheel
18 Clamping lever
19 Star-knob bolt for brake-wheel inclination
20 Star-knob bolt for brake-wheel clearance
21 Connection socket
22 Crank for adjusting the feed pressure
23 Gap opening
24 Guide rail
25 Screw/wing nut
26 Screw for guide-rail adjustment
27 Coolant hose with nozzle
28 Shut-off valve
29 Magnetic holder
30 On/off switch for coolant pump
31 Drain hose for coolant return
32 Coolant tank
33 Drill hole
34 Threaded hole
Assembly instructions (figures 1–3).
Belt grinder GX75.
Before any work on the machine itself, pull the
mains plug.
Dismount the spark guard (3).
Dismount the grinding rest (5), the chip/grinding-dust
box (6) and the star-knob bolt (4).
Open side cover (8).
Loosen the tensioning device (1) and remove the grinding
belt.
Shut the side cover.
Loosen the lever of tilting device (7) and set the belt
grinder to a horizontal position.
Cylindrical grinding device GXC (figure 2).
Remove the unit from its packaging and fit the accessories
as described in the data sheet.
Position the cylindrical grinding device against the belt
grinder and align the drill holes (33).
Connect both machines with the two levers as well as the
screws with wing nuts (9).
Lightly tilt the device toward the front.
Tighten the levers of the tilting device (7).
Loosen the four star-knob bolts (10) below basin (14)
and align the bottom part of the cylindrical grinding
device at the floor.
Tighten the four star-knob bolts (10) below basin (14)
again.
The power cable must be connected by a qualified
electrician to the connection point in the switch of
the belt grinder GX75 according to the wiring dia-
gram (see Appendix).
Coolant unit GXW (figures 3+4).
Position the tank on the base plate of the cylindrical
grinding device.
Fill approx. 10–15 liters of coolant into the coolant tank.
Place the lid with the pump unit onto the tank and mount
the drain hose (31) to the connection sleeve of the tank
(14).
Mount coolant hose (27) on the cylindrical grinding
device with magnetic holder (29) in the threaded hole
(34).
The coolant hose must be mounted in such a man-
ner that the brake wheel or workpiece cannot
catch hold of it.
Plug the plug of the coolant unit into socket outlet (21).
Mounting/replacing the grinding belt
Before any work on the machine itself, pull the
mains plug.
Loosen the tensioning device (1) and mount a
75 x 2000 mm long grinding belt.
The running-direction marking of the grinding belt
must correspond with the rotation direction.
Tension the grinding belt with the tensioning device (1).
Move the grinding belt manually and observe, if it moves
off towards the left or right of the contact roller.
Adjust the guidance of the drive wheel on the belt grinder
such that the grinding belt runs centrally. The exact cali-
bration is carried out while the machine is running.
Switch the belt grinder on. Check if the contact pulley
rotates in the direction of the arrow.
Switch the belt grinder off again.
If the contact disc rotates in the opposite direction
of the arrow, the motor's direction of rotation must
be changed by a qualified electrician.
Adjusting the guide rail (figures 3A+5).
Before any work on the machine itself, pull the
mains plug.
Loosen both screws (26) and adjust the clearance of the
guide rail to the brake wheel:
– Pipe diameter 10–12 mm: Adjustment according to
figure "1".
– Pipe diameter 12–100 mm: Adjustment according to
figure "2".
Tighten screws (26) again.
Adjusting the brake wheel (figure 3).
Before any work on the machine itself, pull the
mains plug.
en
13