Destined Use; Regulations For The Prevention Of Accidents; Safety Instructions - PFAFF silberblau SW W-SGO Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wall mounted winch with worm gear
English
Before taking into operation, please carefully read this operating instruction!
Observe the safety instructions!
File documentation!

Destined use

The wall winch with worm gear is a manually operated winch fixed to the wall for lifting and lowering of loads.
Power operation is not allowed.
The winch is not designed for continuous operation.
Not suitable for use in explosive danger area.
Not suitable for use in corrosive atmosphere.
Alterations to the winch or fitting of accessories are only allowed with our written approval.
Pay attention to the technical data and functional description!

Regulations for the Prevention of Accidents

Observe any rules which are valid for the respective country.
Presently valid in Germany:
BGV D8 winches- lifting and pulling devices
BGR 500-2.8 Load suspension devices in hoist operation
DIN 15020 page 1 and page 2
EC directive 98/37/EC
FEM 9.661 ISO 4308/1
1)
In the respective version

Safety Instructions

Operation, installation and maintenance work should only be executed by personnel who are:
• competent
• trained
• familiar with the relevant regulations
Do not grease or lubricate the brake mechanism.
Never touch moving parts.
Moving of people by the winch or of loads over people is strictly
forbidden.
Defects must be repaired immediately by competent trained personnel.
The load
must not be left suspended without supervision,
must not be allowed to swing
must not fall into the wire rope
The rope
should only be used for lifting, lowering or pulling of various loads and must not be used for any
other purpose.
at least 3 full turns of rope should remain on the drum when loaded.
fleet angle (see Picture)
for standard wire rope ≤3°
for special rope ≤1,5°
when filled to its capacity the drum flanges must project not less than 1.5 times the diameter of
the rope.
examine and service regularly acc. to DIN 15020 page 2
only handle with safety gloves
do not touch the rope inlet
slowly position the slack rope to the load
technische Änderungen vorbehalten
design changes under reserve
F 04.06.062
1)
changements techniques sous réserve
1,5°
1,5°
3. 2. 1.
Seite / page 7

Publicité

Table des Matières
loading

Table des Matières