Getting Started - Belkin OmniView PRO3 Manuel De L'utilisateur

Masquer les pouces Voir aussi pour OmniView PRO3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
Installation
Example of Daisy-Chain Configuration
cable 1
cable 2
cable 3

Getting Started:

Step 1: Make sure that all servers and PRO3 KVM Switches are powered off and
that each PRO3 KVM Switch has been assigned a unique BANK address.
Step 2: Place all primary and secondary KVM switches in the desired location.
Step 3: Connect the console monitor, keyboard, and mouse to the console ports
of the primary switch (BANK 00). Refer to "Connecting the Console to the PRO3
KVM Switch" on page 14.
22
22
Primary unit (BANK 00)
Secondary unit ( BANK 01)
Secondary unit ( BANK 02)
Secondary unit ( BANK 03)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

F1da104zeaF1da108zeaF1da116zea

Table des Matières