Riello P 300 P/G Manuel D'entretien page 57

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(1): for two stages progressive version
(2): for modulating version
NOTE
- Check the lock-out by darkening the photo-cell after re-
moval of the cover.
Attention: high voltage.
Key to layout
BP
Pressure probe
BT
Temperature probe
I1
Burner manual stop switch
MB
Burner terminal block
S
Remote lock-out signal
TL
Load limit remote control
TR
High-low mode load control system
TS
Safety load control system
a-d
Red
b-c
White
5482
ELECTRICAL WIRING TO THE TERMINAL BOARD
STAR - DELTA START UP
(carried out by the installer)
D2704
system
(1)
A
A gG/gL
B
C
GB
8
(1)
230V
400V
50
40
mm
2
6
4
2
mm
4
2,5
(2)
D2575

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

483 m1

Table des Matières