5.3 Installation – body design
Procedure:
→
Hold the device with a open-end wrench on the body and screw
into the pipeline.
Valve body must not be installed under tension.
Sealing material must not get into the device.
→
Observe direction of flow: from 1 → 2 (from P → A),
or CF B from P → B.
5.4 Installation – flange design
Procedure:
→
Loosen nut and remove coil.
→
Insert seal into body.
→
Screw body onto connection plate.
→
Install coil (see chapter „5.6").
→
Observe direction of flow:
from 1 → 2 (from P → A),
or CF B from P → B.
8
english
5.5 Electrical connection of the cable plug
WARNING!
Risk of injury due to electrical shock.
▶ Before reaching into the system, switch off the power supply and
secure to prevent reactivation.
▶ Observe applicable accident prevention and safety regulations for
electrical equipment.
If the protective conductor is not connected, there is a risk of electric
shock.
▶ Always connect protective conductor and check electrical continuity.
Procedure:
→
Tighten cable plug (for permitted types see data sheet), observing
max. torque 1 Nm.
→
Check that seal is fitted correctly.
→
Connect protective conductor and check electrical continuity.