6-
DESCRIPTION – OPERATIONS
GENERAL DESCRIPTION
Motor compressor
. COPELAND accessible hermetic reciprocating compressor.
400V three-phase motor with integral electronic thermistor protection (depending model)
. Suction and discharge safety valves
. crankcase heater.
. Oil sight glass.
. Oil pressure switch on certain models (DISCUS).
.Module CORESENSE (protection et surveillance) for STREAM compressors (4M and 6M). For more details about the
module CORESENSE, see pages 10 to 26.
. Cooler fan as a standard feature on certain models
Horizontal receiver
. In conformity with directive PED 2014/68/UE.
. "ROTALOCK" safety switch on liquid input and output
Warning : it is mandatory for the refrigeration contractor to assembly a safety valve on receiver with category over I.
DIFFERENT CONFIGURATIONS
Refrigerating fluid
R404A, R507A, R134A, R407C, R407F, R407A, R422A, R417A.
Application
:
. Positive -20° +10°C
Medium temperature version
. Negative -40°C to -20°C
Low temperature version
INSTALLATION
7-
SPECIFIC INSTALLATION RECOMMENDATIONS
These units must be installed in area protected from weather.
For certain installations (e.g.: multi-station refrigeration, very large network), the use of an oil separator may prove necessary. It
is essential that the separator return be positioned on the suction line.
REFRIGERATION NETWORK CONNECTION
General information
B
EFORE ANY WORK IS DONE ON THE REFRIGERATION CIRCUIT
The piping used (copper or steel) must be of refrigeration quality in accordance with PED 2014/68/EU.
All piping must be correctly supported and fixed and should in no case be allowed to restrict the piping of the unit.
Connection to suction
The pipe diameters must be determined in advance to ensure correct oil return and should not be based on the diameters of the
collector suction valves.
The piping should always fall towards the unit, never away.
A suction line accumulator, preferably non shut-off, can be added on this circuit, as long as it is correctly sized in relation to the
power of the unit and the installation design.
Connection to liquid line
To be connected on the liquid receiver and the following items should be provided in this order:
-
Drier
-
Sight-glass for the fluid
-
Solenoid valve
This solenoid valve should be positioned near the evaporator if the fluid line circuit exceeds 5m in length.
If the option of a liquid line is required, this should be connected after the solenoid valve if the installation layout permits.
,
THE HOLDING CHARGE MUST BE REMOVED
.
34/78