Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. START-UP. OPERATION AND ADJUSTMENTS.
3.1 OPERATION CONTROLS.
Once the electrical power supply installation has been carried out, you can proceed to start the equipment up.
This section describes the control and regulation system.
1
3
4
5
6
7
Mark
Symbol
ON
1
(A)
2
3
4
5
6
7
8
GALA CUT 350 K G.E.
Control panel of the GALA CUT 350 G.E. equipment
2

Front panel

Description of use.
On switch and indicator.
Outlet current regulation in Amperes.
Thermal protection application indicator.
Indicator of voltage presence in torch and torch switch.
Indicator of existence of a problem with accessories (See section 5)
Air-bleed.
Torch swich
Pág. 14
Rear panel
.
8
Torch

Publicité

Table des Matières
loading

Table des Matières