Inline Pressure Boosting System
Re-calibration of Control Head:
There are times, especially after servicing, that the Inline 400 needs to be re-calibrated.
This is necessary in order to re-establish a reference point for the indication of flow. Follow
these procedures for Field Flow Calibration:
1. Before powering the unit on, verify there is no water flowing in the system. This will
ensure that the flow piston is in the fully seated (zero flow) position.
2. While holding down the push button on the status display, plug the unit's power
cord into the receptacle (or switch on breaker if hard-wired). Continue holding
down the button for five seconds until both the green and red LEDs blink, indicating
calibration is complete. Release the button and the red LED should come on solid,
indicating calibration was successful.
3. Open valves/taps to begin water flow and confirm unit is operating properly.
Outline Dimensions for Inline 400:
14
Model Description
Pump Housing Wrench
Inlet or Outlet Pressure Switch (40 psi)
Replacement Pump Housing
Replacement control cap w/display
Replacement Mounting Base
Motor Capacitor - 115 V (w/boot)
Motor Capacitor - 230 V (w/boot)
Power Cord - 115 V
Power Cord - 230 V
Flow Piston Kit
Pump Housing O-ring
Order No.
305572001
305572007
305572009
305572010
305572011
305572012
305572013
305572014
305572015
305572016
305572017