Progress PKG1441 Notice D'utilisation page 28

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

28 progress
Climate
Ambient temperature
class
SN
+10°C to + 32°C
N
+16°C to + 32°C
ST
+16°C to + 38°C
T
+16°C to + 43°C
Electrical connection
Before plugging in, ensure that the voltage
and frequency shown on the rating plate
correspond to your domestic power supply.
The appliance must be earthed. The power
supply cable plug is provided with a contact
for this purpose. If the domestic power sup-
ply socket is not earthed, connect the appli-
ance to a separate earth in compliance with
current regulations, consulting a qualified
electrician.
The manufacturer declines all responsibility
if the above safety precautions are not ob-
served.
This appliance complies with the E.E.C. Di-
rectives.
Door reversibility
The door of the appliance opens to the
right. To open the door to the left, do these
steps before you install the appliance.
• Loosen and remove the upper pin.
• Remove the upper door.
• Remove the spacer.
• Loosen the middle hinge.
• Remove the lower door.
• Loosen and remove the lower pin.
On the opposite side:
• Tighten the lower pin.
• Install the lower door.
• Tighten the middle hinge.
• Install the spacer.
• Install the upper door.
• Tighten the upper pin.

Publicité

Table des Matières
loading

Table des Matières