○
Locate fl ange gasket over bolts of oil furnace mounting fl ange, prior to placing
bottom front cover up to mounting fl ange.
○
Align mounting bolts on fl ange align with clearance holes in bottom front panel
when panel loosely fi t in fi nal position.
○
Correct position of bottom front panel has top fl ange of panel over top of fi rebox
front fl ange and underneath furnace bottom.
○
New bottom front panels in oil furnace module kits.
RIGHT HAND RA PANEL
NOTE
Not all oil burner module kits require adapter collar and second fi bre gasket.
Check "Manual" Addendum accompanying oil furnace module for specifi c assembly details.
STEP #14A
○
When using the Riello Oil Burner (kit # HMFK-OFRF40), the
burner mounting fl ange must be located so that the mounting
surface of the fl ange is 2.5" (63.5mm) from the fi ring end of
the blast tube (combustion head). See diagram.
STEP #14B
○
Fasten bottom front cover to corner posts using hex head
wildrill screws. Assemble burner, fl ange adapter collar (used
with Riello Burner only - kit # HMFK-OFRF40), and gaskets
to oil furnace mounting fl ange bolts as per diagram.
○
Attach oil furnace sight glass, gasket, and bracket to bottom
front panel using (2) hex screws.
BRASS NUTS
OIL BURNER
MOUNTING
FLANGE
OIL BURNER
LEFT HAND RA PANEL
ADAPTER
COLLAR
FIBRE
GASKETS
FIREBOX
FRONT
OIL FURNACE
FURNACE BOTTOM
COMBUSTION CHAMBER
2.5"
(63.5mm)
BOTTOM FRONT
COVER
OIL FURNACE
FLANGE
GASKET
SIGHT GLASS
SIGHT GLASS BRACKET
LEFT HAND RA CONFIG SHOWN
W415-1504 / B / 11.30.16
27
EN
FLANGE GASKET
FLUE
OIL FURNACE