Napoleon HYBRID 150 Instructions D'installation Et D'utilisation page 26

Masquer les pouces Voir aussi pour HYBRID 150:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

26
STEP #12
Insert the stainless steel oil furnace combustion chamber/heat exchanger HMFK-CMBCH-1 (HMF150) or
HMFK-CCH200 (HMF200), into the lower cavity of HMF150/200 body (see diagrams). Ensure the heat
EN
exchanger is on the same side as the blower.
AIR FLOW
DIRECTION FROM
BLOWER MODULE
HEAT EXCHANGER
LEFT HAND RA CONFIGURATION (HMF150 SHOWN)
TAKE PARTICULAR CARE TO ORIENTATE OIL FURNACE AS PER DIAGRAMS FOR LEFT AND RIGHT
HAND RA. THE OIL FURNACE COMBUSTION CHAMBER AND HEAT EXCHANGER WAS DESIGNED
AND TESTED FOR THE EXCHANGER SECTION OF THE ASSEMBLY TO FACE THE AIR STREAM
COMING FROM THE BLOWER MODULE. INCORRECTLY ASSEMBLED OIL FURNACE COMPONENTS
CAN RESULT IN POOR PERFORMANCE AS WELL AS COMPONENT AND/OR PROPERTY DAMAGE.
Push the oil combustion chamber/heat exchanger into the cavity until the fl ue pipe protrudes through the
opening of the rear furnace panel.
STEP #13
Align mounting fl ange and bolts with fl ange pattern on new bottom front panel (supplied) with HMFK-
OFRF40, HMFK-OFBNX module kits in both left and right hand RA versions.
W415-1504 / B / 11.30.16
COMBUSTION CHAMBER
COMBUSTION CHAMBER
HEAT EXCHANGER
RIGHT HAND RA CONFIGURATION (HMF150 SHOWN)
AIR FLOW
DIRECTION FROM
BLOWER MODULE
H3.44

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Hybrid 200Hmf150Hmf200

Table des Matières