- EN -
4.3
Connecting the control system with EGC box
4.3.1
Connecting the control system
The cable harness contains the connection cables of the signal box, the drum motor and the rinsing pump.
These connection cables have to be connected, the EGC box is already connected.
G
► Connect the three connectors of the cable harness to the control system sockets. Hand-tighten the
union nuts.
– The connections are designed to prevent misconnection.
– First flood the container with water, then connect the control system to the mains voltage/power
supply.
4.3.2
Connecting the EGC box
Integration of the filter system into the EGC network is optional and not necessary for operation. (→ Easy
Garden Control System (EGC))
The Connection Cable EGC cable is required for connecting the EGC box.
The correct fastening of the plug connector is important for a secure connection and an interference-free
EGC network.
How to proceed:
H, I
1. Remove the protection cap from EGC-IN.
2. Fit the plug connector of the ECG connection cable and secure with the two screws (max. 2.0 Nm).
– Ensure that the rubber seal is clean and fits exactly.
– Replace the rubber seal if damaged.
3. Remove the protection cap from EGC-OUT, fit the terminal resistor and secure it with the two screws
(max. 2.0 Nm) or another EGC compatible unit.
– No Connection Cable EGC is connected to EGC-OUT on the last unit in the EGC network. The
terminal resistor has to be fitted to this EGC-OUT so that the EGC network is correctly terminated.
– The terminal resistor is included in the delivery scope of the InScenio FM-Master WLAN EGC.
4.4
Installing the control system with EGC box
► Install the control system at a minimum distance of 2 m from the pond.
► Protect the control system from direct sun radiation.
► The control system is splash-proof and may be exposed to rain.
How to proceed:
J
1. Either attach the control system and EGC box to the container wall or use threaded hooks to mount it
in different position.
2. If the EGC box is attached to the container wall, fit both caps onto the cap nuts.
– The caps fix the EGC box in place.
48