Panasonic SXC093E5 Série Manuel D'installation page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 664
RECONFIRMATION
9
WARNING
Be sure to switch off all power supply before performing each of
the below checkings. Before obtaining access to terminals, all
supply circuits must be disconnected.
CHECK WATER PRESSURE
Water pressure should not lower than 0.05 MPa (with inspects the
Water Pressure Gauge d). If necessary add tap water into Tank
Unit. Refer to Tank unit installation instruction for details on how to
add water.
CHECK PRESSURE RELIEF VALVE c
Check for correct operation of Pressure Relief Valve c by turning
on the lever to become horizontal.
If you do not hear a clacking sound (due to water drainage), contact
your local authorized dealer.
Push down the lever after fi nish checking.
In case the water keeps drained out from the unit, switch off the
system, and then contact your local authorized dealer.
EXPANSION VESSEL b PRE PRESSURE CHECKING
[Lower limit water volume of the system]
Please ensure the capacity of the circulating water of the total
system including the capacity of the indoor unit is more than 50 L.
If the water capacity is insuffi cient, during deice operation, the water
temperature is lowered and the water will freeze in the system's
component leading to product failure.
[Upper limit water volume of the system]
The indoor unit has a build-in Expansion Vessel with 10 L air
capacity and initial pressure of 1 bar.
Total amount of water in the system should be below 260 L.
If the total amount of water is more than 260 L, please add
expansion vessel (fi eld supply).
The expansion vessel capacity required for the system can be
calculated from the formula below.
V =
1 -
V : Required gas volume <expansion vessel volume L>
Vo : System total water volume <L>
: Water expansion rate 5
P
: Expansion tank fi lling pressure = (100) kPa
1
P
: System maximum pressure
2
- (
) Please confi rm at actual place
- The gas volume of the sealed type expansion vessel is presented by <V>.
It's advised to add 10% margin for required gas volume of calculation.
Water expansion rate table
Water temperature (°C)
10
20
30
40
50
60
70
80
90
[Adjustment of the initial pressure of the expansion vessel when
there is a difference in installation height]
If the height difference between the indoor unit and the highest
point of the system water circuit (H) is more than 7m, please adjust
the initial pressure of the expansion vessel (Pg) according to the
following formula.
Pg= (H*10+30) kPa
*(0.1 MPa = 1 bar)
x Vo
98 + P
1
98 + P
2
60˚C = 0.0171
= 300 kPa
Water expansion rate
0.0003
0.0019
0.0044
0.0078
0.0121
0.0171
0.0228
0.0291
0.0360
CHECK RCCB/ELCB
Ensure the RCCB/ELCB set to "ON" condition before check RCCB/
ELCB.
Turn on the power supply to the Indoor Unit.
This testing could only be done when power is supplied to the
Indoor Unit.
WARNING
Be careful not to touch parts other than RCCB/ELCB test button
when the power is supplied to Indoor Unit. Else, electrical shock
may happen. Before obtaining access to terminals, all supply
circuits must be disconnected.
Push the "TEST" button on the RCCB/ELCB. The lever would turn
down and indicate "0", if it functions normal.
Contact authorized dealer if the RCCB/ELCB malfunction.
Turn off the power supply to the Indoor Unit.
If RCCB/ELCB functions normal, set the lever to "ON" again after
testing fi nish.
This product contains fl uorinated greenhouse gasses.
Refrigerant type : R410A (GWP=2088)
Amount : 2.85 kg (5.951 ton CO
(The amount do not include the additional refrigerant when
refrigerating piping length extended. Please refer to adhered label
on outdoor unit for exact amount of refrigerant used and actual
tonnes of CO
equivalent.)
2
TEST RUN
10
1. Fill up the Tank Unit with water. For details refer to Tank Unit
installation instruction and operation instruction.
2. Set ON to the Indoor Unit and RCCB/ELCB. Then, for control
panel operation please refers to air-to-water heatpump operation
instruction.
3. For normal operation, pressure gauge d reading should be in
between 0.05 MPa and 0.3 MPa.
4. After test run, please clean the Water Filter Set e. Reinstall it
after fi nish cleaning.
RESET OVERLOAD PROTECTOR a
Overload Protector a serves the safety purpose to prevent the
water over heating. When the Overload Protector a trip at high
water temperature, take below steps to reset it.
1. Take out the cover.
2. Use a test pen to push the centre button gently in order to reset
the Overload Protector a.
3. Fix the cover to the original fi xing condition.
equivalent)
2
Use test pen to push
this button for reset
Overload protector a.
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sxc126e5 série

Table des Matières