29. Tank heat up time (max)
Set max boiling hours of tank.
When max boiling hours are shortened, it immediately returns to Heating
operation, but it may not fully boil the tank.
30. Tank re-heat temp.
Set temp to perform reboil of tank water.
(When boiled by heat pump only, (51°C – Tank re-heat temp) shall become
max temp.)
Setting range is -12°C ~ -2°C
31. Sterilization
Set timer to perform sterilization.
1 Set operating day & time. (Weekly timer format)
2 Sterilization temp (55~75°C If use back-up heater, it is 65°C)
3 Operation time (Time to run sterilization when it reached setting temp
5min ~ 60min)
User shall set whether to use or not to use sterilization mode.
3-5. Service Setup
32. Pump maximum speed
Normally setting is not necessary.
Please adjust when need to reduce the pump sound etc.
Besides that, it has Air Purge function.
33. Pump down
Operate pump down operation
34. Dry concrete
Operate concrete curing operation.
Select Edit, set temp for every stage (1~99 1 is for 1 day).
Setting range is 25~55°C
When it is turned ON, dry concrete starts.
When it is 2 zone, it dries both zones.
30
Initial setting: 60min
Initial setting: -8°C
Initial setting: 65°C 10min
Initial setting: Depend on model
Service setup
Pump down:
Service setup
12:00am,Mon
ON
Confi rm
40°C
35°C
30°C
1
2
3
Heat
Tank
5min ~ 4h
-12°C ~ -2°C
②
① ③
Flow rate
Max. Duty
88:8 L/min
0xCE
Select
Service setup
Pump down operation
Pump down:
in progress!
ON
OFF
Confi rm
45°C
40°C
35°C
4
5
6
Stage
12:00am,Mon
Operation
Air Purge
12:00am,Mon