Getting Started; Checking The Contents Of Packing; Placing Prepamatic-2; Removal Of Transport Fittings - Struers Prepamatic-2 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Checking the Contents of
Packing

Placing Prepamatic-2

Removal of Transport Fittings

2
Prepamatic-2
Instruction Manual

1. Getting Started

The crate in which Prepamatic-2 is delivered contains the following
items:
1
Prepamatic-2
with 5 grinding/polishing stations, or
with 1 grinding station and 4 grinding/polishing stations
1
box with:
5
Splash rings
4
(
pcs for Prepamatic-2 with grinding station)
1
Splash ring for OP-S
1
Water inlet hose 3/4" x 2 m
2
Filter gaskets
1
Reduction ring with gasket
1
Water outlet hose 32 mm x 3 m
2
Hose clamps 25-40 mm
1
Pressure hose 1/4"
1
Hose nipple for pressure hose
2
Hose clamps 12 mm
1
Soap,
4
Rubber blocks
1
Allen key 5 mm,
(
only Prepamatic-2 with grinding station
3
Specimens, prepared
1
Set of Instruction Manuals
Prepamatic-2 should be placed near water supply, drain, 3 -phase
current and compressed air.
Position the machine leaving a space of at least 0.5m on the right, for
servicing electronics, and 0.3m on the left, for access to the bottle
unit.
Do not bolt Prepamatic-2 to the floor. Support each corner with the
enclosed rubber blocks until the machine is level.
After installing Prepamatic-2 in its final position, the support block
which is placed under the coupling for the specimen holder head can
be removed and Prepamatic-2 is ready for connection.
)

Publicité

Table des Matières
loading

Table des Matières