Mobile Home Installation - England's Stove Works 25-PAH Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION 
 
Mobile Home Installation 
 The England's Stove Works, Inc. outside air kit MUST be used for installation of this unit in a 
mobile home.  Please see the "Outside Air" section on page 15 for more information 
regarding outside air connections. 
 The outside air inlet must be kept clear of leaves, ice and other debris. Keeping the outside 
air inlet free of restriction is crucial to preventing air starvation and smoke spillage. 
 The pellet stove MUST be secured to the floor of the mobile home using lag bolts and the 
holes provided in the bottom of the base for this purpose.  Outdoor‐aired space heaters 
must be attached to the structure. 
 The pellet stove MUST be grounded with #8 solid copper grounding wire (or equivalent), 
terminated at each end with an NEC approved grounded device. 
 Carefully follow all clearances listed in the appropriate section of this manual AND follow 
the venting manufacturer's minimum clearance requirements.  Similarly, be certain the 
venting system used is approved for mobile home use. 
 Installation must be in accordance with Manufacturers Home & Safety Standard (HUD) CFR 
3280, Part 24 as well as any applicable local codes. 
 Use silicone to create an effective vapor barrier at the location where the chimney or 
outside air ducting passes through to the exterior of the structure. 
 
 
Chimney Cap/Spark Arrestor 
 
 
Joist Shield/Firestop 
 
WARNING: 
THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL 
DO NOT CUT THROUGH FLOOR JOISTS, WALL STUDS, CEILING TRUSSES OR ANY 
OTHER SUPPORTING MATERIAL WHICH COULD BE DETRIMENTAL TO THE 
IMPORTANT! READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING
CLEANING THE UNIT AS SPECIFIED, AND REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR
DUE TO UNSAFE INSTALLATION OR USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH QUESTIONS.
DO NOT INSTALL IN A SLEEPING ROOM. 
CAUTION 
AND CEILING/ROOF MUST BE MAINTAINED. 
STRUCTURAL INTEGRITY OF THE HOME.  
For high altitude installations (above 4,000
ft.), the vent pipe should be increased from
3-inch (3") to four-inch (4").
14
Roof Flashing and 
Storm Collar 
Mobile Home 
Approved Type P or PL 
Pellet Vent Pipe 

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

55-shpah55-trpah

Table des Matières