Putting Into Operation - Abicor Binzel DAV Mode D'emploi

Masquer les pouces Voir aussi pour DAV:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6 Putting into operation

6 Putting into operation
6.1 Installation
EN - 14
At an operating pressure of at least 5 bar, the cylinder (9) is set in the
pneumatic end positions. Signal evaluation takes place in a higher-level safety
circuit.
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to for the entire duration of
maintenance, servicing, mounting, dismounting and repair work:
• Switch off the power source.
• Close the gas supply.
• Close off the compressed air supply.
• Disconnect all electrical connections.
• Switch off the entire welding system.
NOTE
• Please take note of the following instructions:
 3 Product description on page EN-10
• The wire cutting device must only be put into operation by authorised
personnel (in Germany see TRBS 1203).
Install the DAV on a cleaning station, welding device or ATS rotor.
1 Screw the DAV to a vibration-free mounting surface.
2 Adjust the mounting bracket. For optimum access and installation, the
mounting bracket can be screwed to the cylinder in four positions each
offset by 90°.
DAV

Publicité

Table des Matières
loading

Table des Matières