8. Insert the M.2 SHIELD FROZR heatsink shaft into the groove.
9. Push the M.2 SHIELD FROZR heatsink down.
10. Secure the M.2 SHIELD FROZR heatsink onto the mounting pole.
10
V-Check Points
These voltage checkpoints are used to measure the current system voltages. A
multimeter (not included) will be required to check voltages. To measure voltage,
place test leads on the GND (screw mountin g hole) and a V-Check Point. Please refer
to the manual of your multimeter for more information.
8
9
GND
CPU
VCCIO
VSA
DRAM
PCH
Overview of Components
25