Finishing; Mounting Cabinet Installation - Napoleon GT8N Instructions D'installation Et D'opération

Gaz naturel/ propane
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.0 FINISHING

THE FRONT OF THE APPLIANCE MUST BE FINISHED WITH ANY NON-COMBUSTIBLE MATERIALS
SUCH AS BRICK, MARBLE, GRANITE, ETC., PROVIDED THAT THESE MATERIALS DO NOT GO
DO NOT STRIKE, SLAM OR SCRATCH GLASS. DO NOT OPERATE APPLIANCE WITH GLASS
FACING AND/OR FINISHING MATERIAL MUST NEVER OVERHANG INTO THE APPLIANCE OPENING.
6.1

MOUNTING CABINET INSTALLATION

BEFORE STARTING THE INSTALLATION REMOVE THE PROTECTIVE LAYER FROM ALL THREE
COMPONENTS THAT MAKE UP THE GT8 (CABINET, FRAME, AND TORCH)
NOTE: It is recommended that all fasteners be
stainless steel.
Using the installation template (W122-0401)
A.
supplied with the TMCK or TMCSS kit, determine
the best mounting location for your new Torch. See
"MINIMUM CLEARANCE TO COMBUSTIBLES"
section. Mark all 14 hole centres on the wall
(surface) using the template.
NEVER OBSTRUCT THE FRONT OPENING OF THE APPLIANCE.
BELOW THE SPECIFIED DIMENSION AS ILLUSTRATED.
REMOVED, CRACKED, BROKEN OR SCRATCHED.
WARNING
!
RISK OF FIRE!
WARNING
!
1
72.1A
INSTALLATION
TEMPLATE
TORCH
MOUNTING
FRAME
CABINET
W415-1367 / 12.05.14
23
EN

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Gt8p

Table des Matières