Festo DGO-12-A-B Notice D'utilisation page 25

Masquer les pouces Voir aussi pour DGO-12-A-B:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
DGO−...−A−B
7
Commissioning
Commissioning the complete system
Always pressurize the complete system
S
slowly.
In this way you will prevent sudden
uncontrolled movements.
For slow start−up pressurization, use
start−up valve type HEL−.../HEM−... .
Commissioning the DGO−...
Warning
Make sure that:
nobody can place his/her hand in the
path of the moving mass (e. g. by
providing a protective grill).
there are no objects in its path.
It must not be possible to touch the
DGO−... until it has come to a complete
stand.
1. Close both one−way flow control valves
at first completely,
then loosen them one turn.
Festo DGO−...−A−B 0410b English
Fig. 14
Ó
Ó
Ó
Fig. 15
Fig. 16
Ó Ó
Ó Ó
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dgo-16-a-bDgo-20-a-bDgo-25-a-bDgo-32-a-bDgo-40-a-b

Table des Matières