Notice Of Installation - mundoclima MUPO-H8 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Notice of Installation

Open the box and check unit in area with good ventilation (open
the door and window) and without ignition source.
Note: Operators are required to wear anti-static devices.
It is necessary to check by professional whether there is refrigerant
leakage before opening the box ; stop installing the air conditioner
if leakage is found.
The fire prevention equipment and anti-static precautions shall be
prepared well before checking.Then check the refrigerant pipeline to
see if there is any collision traces, and whether the outlook is good.
Safety Principles for Installing Air Conditioner
Fire prevention device shall be prepared before installation.
Keep installing site ventilated.(open the door and window)
Ignition source, smoking and calling is not allowed to exist in area
where R290 refrigerant located.
Anti-static precautions in necessary for installing air conditioner,
e.g. wear pure cotton clothes and gloves.
Keep leak detector in working state during the installation.
If R290 refrigerant leakage occurs during the installation, you shall
immediately detect the concentration in indoor environment until it
reaches a safe level. If refrigerant leakage affects the performance
of the unit, please immediately stop the operation, and the unit
must be vacuumed firstly and be returned to the maintenance
station for processing.
Keep electric appliance, power switch, plug, socket, high
temperature heat source and high static away from the area
underneath sidelines of unit.
The unit shall be installed in an accessible location to installation
and maintenance, without obstacles that may block air inlets or
outlets of units, and shall keep away from heat source,
inflammable or explosive conditions.
Unpacking Inspection
46

Publicité

Table des Matières
loading

Table des Matières