5.2 Installation instructions for anchor point SKYLOTEC Secupin SPA-TYPE-5-L
with prestressed concrete dowel K 55 M10/0-10 D A4
1
2
3
4
6.
IDENTIFICATION
All system components of the Secupin fall protection system are identified with the manufacturer's logo and the
necessary information for each user. Each SECUPIN anchor point carries the manufacturer's logo and serial
number on rod or tube.
Before installing anchor eyelet AP-068-3 or AP 068-2, the correct number of users per installation instructions must
be entered with an X in the provided identification field with a letter punch. Thereafter, the anchor eyelet contains all
necessary information for the user and may be installed.
MAT-MA-0018-EN SECUPIN
Please observe installation instructions and approval (Z-21.1-701)
of fasteners.
Drill hole with a nominal diameter d
Insert dowel and hammer down flush with a setting tool
Install single anchor point and apply torque of 20 Nm with calibrated
torque spanner.
Prestressed concrete dowel in expanded state.
23/01/2015
=14 mm.
o
Page 5 of 16