Télécharger Imprimer la page

C - Location Of The Remote Control; Use Of The Appliance; A - Preliminary Operations - Olimpia splendid DOLCECLIMA Instructions Pour L'installation, L'emploi Et L'entretien

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79
• if the remote control is not used for several weeks or longer, remove the batteries.
Any leaks from the batteries could damage the remote control.
Do not re-charge or disassemble the batteries. Do not throw the batteries into the fire.
They can burn and explode.
If the battery liquid falls onto the skin or clothes, wash well with clean water. Do
not use the remote control with batteries that have leaked.
The chemical products contained in the batteries can cause burns or other risks
to health.

3.3.c - Location of the remote control

• Keep the remote control in a position from which the signal can reach the receiver (29) of the appliance
(maximum distance is approx. 8 metres - with charged batteries) (figure 18).
the presence of obstacles (furniture, curtains, walls, etc.) between the remote control and the appliance
reduces the remote control range.

3.4 - USE OF THE APPLIANCE

Work as follows in order to use the appliance.
To prevent possible damages to the compressor, each start is delayed by 3 minutes
with respect to the last switching off.

3.4.a - Preliminary operations

• Place the appliance on a stable and not inclined base, at at least 20/30 cm. from
the wall or from any other object, in order to ensure the correct air circulation.
(Fig.1). Place it on a water-resistant surface since the possible water leakage
could damage furniture or the floor.
• Do not place the appliance directly on carpets, towels, blankets or other absor-
bent surfaces.
• Insert the plug in the power socket, ensure the power switch (fig. A ref. 28) is
set to "I". The appliance emits a "beep", on the display appears the icon
and the environment temperature in °C.
Before electrically connecting the appliance, make sure the plate data correspond
to those of the electricity distribution network.
EN - 24

Publicité

loading