INSTALLATION
Installation
WPKI-V
The compact heat pump installation comprises all necessary com-
ponents for connecting the WPF heat pump to the SBP 100 cylinder
and the DHW cylinder.
Heat pump flow
1 Connector G 1 ¼ with ball shut-off valve
2 Non-return valve
3 Connector G 1 ¼
Heat pump return
4 Connector G 1 ¼ with connection for drain valve and expan-
sion vessel
5 Ball shut-off valve
6 Connector G 1 ¼ with sensor well for return temperature
sensor
30
| SBP 100
168843_SBP_100_de_en_fr_cs_pl.indb 30
6
1
5
2
4
3
10.4.2 Fitting compact heat pump installations
Material losses
!
No shut-off valves should be installed between the safety
valve and the heat source.
All pre-assembled components are sealed when delivered.
Installation is described in the following chapters:
f We recommend tightening the compact heat pump installa-
f
tion components and the circulation pumps by hand before
installing on the cylinder.
f Fit all components on the cylinder and align them.
f
f Secure the components with the wall mounting brackets.
f
f Tighten the fittings.
f
Circulation pumps
Material losses
!
When fitting the circulation pump, observe the flow di-
rection.
Material losses
!
If energy efficient circulation pumps are used that have
not been approved by us, use an external relay with a
breaking capacity of at least 10 A/250 V AC or our WPM-
RBS relay set.
f Connect the energy efficient circulation pumps approved by
f
us (see chapter "Appliance description / Accessories").
For circulation pump rating curves, see chapter "Specification".
www.stiebel-eltron.com
04.09.2017 13:52:53